Installation Instructions
Table Of Contents
Quick Reference Guide 5
Setting Up the Reader
Follow the steps below to connect and get your reader up and
communicating with its host.
1. Configure the Base Station starting on this page.
2. Charge the Batteries (see page 11).
3. Link to the Base Station (see page 16).
4. Select the Interface Type (see page 16).
5. Configure the Reader starting on page 17 (optional,
depends on settings needed).
Configuring the Base Station
The base charger/station may be configured in desk application to
hold the reader in two different positions, either a horizontal or
standing position, in order to provide the most comfortable use
depending on needs.
Changing the Base Station Position
The base station is configured by installing one of two sets of me-
chanical parts that come with the cordless kit. The default mounts
(shown below) provide three options: vertical (wall) mounting,
standing (45°), or horizontal mounting with a higher mechanical
retention of the scanner. Use the other mounts only for horizontal
Standing
Horizontal