Product manual

Product Manual - DM991 Series V Family - 204.4092.08 53
# --------------------------------------------------------------------------
# D A T A C O M [ 1 ]
# DM991C - G.SHDSL Modem - E1 and V.35 Interfaces
# --------------------------------------------------------------------------
# Tests Menu
#
# D - G.SHDSL interface
# V - V.35 interface
# E - E1 interface
#
#
#
#
#
#
#
#
#
# Option: [ ]
#
#
# --------------------------------------------------------------------------
# <ESC> Back
# --------------------------------------------------------------------------
For all interfaces:
Test status: indicates if there is any test being run and which;
o No test active: no test running;
o Unavailable: the interface is disabled;
o Running LDL: LDL test being run;
o Running LDR-TXLDR: LDR test being run by the local equipment;
o Running LDR-RXLDR: LDR test being run by remote equipment;
o Running LAL: LAL test being run.
For the BERT tests:
BERT status: indicates the test status.
BERT test time (seconds): shows for how long the test has been running.
BERT error time (seconds): shows for how long the test has been in error.
Status of test: indicates the test running.
o Running BERT: only BERT is being run;
o Running TXLDR & BERT: LDR test being run by the local equipment plus BERT
test, both running.
To run the LDR test along with the BERT test, the LDR must be activated first, and then the BERT test.