User guide

Hardware Installation 63
© 2012 Datacom Systems Inc
5.2 Power
This section describes the power connection at the network installation site of the SS-1200-S, SS-
2200-S configurable series.
or
Two DC input power sockets are provided on the rear panel. The front panel POWER 1 and 2
LEDs are illuminated green, respectively:
(BT series) - when DC power is available at both the two rear DC power sockets; or
(SFP series) - when the DC POWER switch is depressed ON and DC power is available at
both the two rear DC power sockets.
Either POWER 1 or 2 LED not illuminated when powered, indicates a defective power source and
immediate investigation as to the cause is required to insure redundant power integrity.
1. Step 1. Using the supplied Power Adapters and AC Line Cords, plug the SS-1200-S, SS-
2200-S series into different circuit external power sources.Although only one power supply is
required to power the configurable unit, use of a second independent power source is strongly
recommended to assure uninterrupted monitoring. Furthermore, connecting the second Power
Adapter to a different external power source circuit than the first AC power source eliminates
power as a single point of failure.
5.3 Any-to-Any Connection
This section will focus on the Any-to-Any port connection of the typical SS-1200-S, SS-2200-S
series hardware installation.
NOTE: For SS-1200-S, SS-2200-S series with a Gigabit Ethernet (GE) small form-factor (SFF)
port, the SFP modules might ship already installed in your unit, or they might arrive packaged
separately. See the 'Small Form-Factor Pluggable' section, 'Installing the SFP Module ,' on how
to install the SFP module.
Step 1. Connect a network or monitoring cable to an Any-to-Any port socket and the other side of
this cable to the network or monitoring tool NIC port as appropriate..
Step 2. Continue repeating Step 1. for any remaining Any-to-Any port socket you want connected
from the SS-1200-S, SS-2200-S series.
59