User manual

Installation and Setup
ProMaster 2500 User Manual 2-3
1. Remove the eight screws (two on each vertical panel) that hold
together the panels of the shipping crate (see Figure 2-2).
2. Carefully lift the top of the shipping crate and pull up the four
vertical panels, and set them aside.
3. Carefully lift the 2500 (this will require two strong people) and set it
on a clean, sturdy, stable surface.
CAUTION: When removed from its shipping crate, the 2500 weighs 160
lb (72.75 kg). It will be difficult to lift and must be placed on
a surface that can support it.
When you unpack your system, confirm that you have received all the
components required to operate the system. Your ProMaster 2500 system
includes the following items:
ProMaster 2500 handler
3.5 inch disks:
TaskLink
program disk,
Boot Files
disk,
Algorithm/
System
disk(s), and
Device List
disk
•Programming module
Two RS-232C cables with male and female DB25 connectors
One 9- to 25-pin adapter cable
Figure 2-2
The 2500 Shipping Crate
2306-1
FRONT
REAR
TOP
PALET