User manual
Index
Index-6 ProMaster 2500 User Manual
P
Package type, selecting, 3-9
Parameter entry fields, 1-14
Parameters
factory default, B-2
system and factory, B-3
Part number, labels, 4-18
Parts per tube, B-4
Parts, 2500, 2-2
PC
connecting to 2500, 2-16
requirements, 1-12
PCU (Pin Control Unit) defined, 5-19
PE (Programming Electronics)
self-calibration, 5-20
self-test, 5-50
Periodic cleaning, 5-56
Personal computer
See PC
Pico fuses, 5-13
Pin Control Unit (PCU) defined, 5-19
Pin driver board, 5-20
PLCC
devices, alignment, 4-27
module contacts, replacing, 7-30
module programming block, replacing, 7-36
PLD, test vector options, 3-13
Positioning optics, 5-7
Power supplies, theory of operation, 5-13
Power supply board, 5-19
Power up the 2500, 2-18, 4-5
Powerup self-test, Programming Electronics, 5-50
Press bearings, adjusting, 5-26
Preventive maintenance, service procedures, 5-60
Print density
about, 3-11
specifications, 1-16
Print drive motor replacement, 7-11
Print head gap, adjusting, dot matrix, 5-24
Print head replacement
dot matrix printer, 7-12
thermal printer, 7-13
Print intensity, adjusting, thermal printer, 2-29
Print Only, F-6
Print quality, dot matrix printer, 2-22
Print shift, B-4
Print shift command, thermal printer, 2-28
Print test, dot matrix printer, 5-46
Printer fuses, 5-13
Printer ribbon cassette, installing (dot matrix), 2-12
Printing problems, 5-22
Process, selecting, 3-8
Program fail message, 5-5
Program operation in a Task, 3-8
Program station, 1-9
Programmer disk, enable option in TaskLink, 3-31
Programmer port, changing the baud rate, F-9
Programming
serial numbers, 3-21
theory of operation, 5-4, 5-20
Programming block, A-6
Programming Electronics
power supply replacement, 7-19
self-calibration, 5-20
self-test, 5-50
Programming Electronics assembly
installing, 7-7
replacement, 7-3
Programming module
about, 5-20
clamp air cylinder, replacing, 7-17
configuration box, 4-9
configuration chart, 4-10
configuring, 4-8
installing, 4-12
PLCC, aligning a device, 4-27
programming block, defined, A-6
time-out delay, B-2
ProMaster parameters, 3-9
ProMaster retries, 3-28
ProMaster 2500, turning on, 2-18
Purge, F-6
Purge option, 3-31
Push buttons, 1-14
Q
Quitting TaskLink, 2-18
R
Radio buttons, 1-14
RAM fill command, 3-18
Registration, xxii
Relative addressing, 3-17
Relay board, 5-19
Remote error codes, handler, E-2, E-10
Remote mode
changing to, 2-20
command set, E-3, E-4—E-9
firmware key, B-2
how to select, 2-20
Remote port, changing the baud rate, F-9
Repair information, xvii
Repair Service, xxii










