User manual
Index
Index-2 ProMaster 2500 User Manual
B
Baud rate
changing 2500 ports, F-9
default, E-2
setting on 2500, 2-21
Beam
aligning, 4-27
lead screw lubrication, 5-62
stall and motor speed, B-3
stalling described, 5-8
stalls, 5-22
theory of operation, 5-8
Beam gasket replacement, 7-25
Beam head rotation motor replacement, 7-14
Beam optic malfunction message, 6-2
Beam traverse motor replacement, 7-14
Bearing plate, checking the height, 2-9, 5-26
Blank check, 3-8, 5-5, 6-3
Board
pin driver, 5-20
power supply, 5-19
relay, 5-19
Bulletin Board Service, xx
Button
CAL, 1-10
E-stop, 4
START, 1-10
C
Calibrating labels
dot matrix labeler, 2-11
theory of operation, 5-15, 5-17
thermal printer, 2-14
Calibration
label detection optic, 4-19
PE, 5-20
setting, label, 5-25
value, label, B-4
Capacitor configuration error message, 6-2
Categories
see Handler sorting
Category X bin not available message, 6-2
Changing your address, xxii
Characters per inch
dot matrix printer, 5-15
thermal printer, 5-17
Chart, chuck selection, 4-16
Check boxes, 1-14
Checking communication, TaskLink, 2-19
Chuck
about, 1-9
installing, 2-8, 4-16
replacing the tip, 4-17
selection chart, 2-8, 4-16, 4-17
theory of operation, 5-8
tips, cleaning, 5-56
Cleaning
application plate, 5-57
beam, 5-61
chuck tips, 5-56
DIP modules, 5-56
label path, dot matrix printer, 5-57
optic holes, 5-56
periodic, 5-56
pinch rollers, 5-57
programming module, 5-57
SOIC modules, 5-56
SPA block, 5-56
2500 exterior, 5-56
Command set, remote mode, E-4—E-9
Communications test, 5-49
Compensated vector test, 3-13
Computer remote control
command set, handler, E-2
default settings, E-18
firmware key, B-2
halting an operation, E-17
overview, E-1
programmer electronics summary, E-18
programming electronics setup, E-17
Remote port setup, E-2
software driver, E-1
standard vs. extended commands, E-19
Configuration blocks, 4-8
Configuration chart, programming module, 4-10
Configuring the programming module, 4-8
Connecting
source air line, 2-5
2500 to PC, 2-16
Continuity test fail, 5-4
Controller board
about, 5-19
replacement, 7-20
theory of operation, 5-13
Controller power supply, replacement, 7-19
CPI (Characters Per Inch), 5-15
CRC Error Codes, E-22
Creating a new file, F-7
Creating label text, 3-11
Customer Resource Center, phone number, 1-19
Customer Support, xvii
Cycle parts, 5-42










