Owner`s manual
1. Place millivolt board in firebox,
aligning the holes in the millivolt
board with holes in the firebox
bottom. MAKE SURE SEALING
GASKET IS IN PLACE ON
FIREBOX BOTTOM! Secure
millivolt board to firebox bottom
with the (8) screws previously
removed.
2. Install burner / burner heat shield
assembly, making sure that the
burner venturi is seated over the
millivolt board orifice and the pilot
assembly is above the burner.
3. Reinstall pilot shield.
4. Reinstall ember refractory panels.
5. Reinstall log set. (Pages 36-39).
6. Reconnect gas line to manual
shut-off valve.
7. Reconnect any wall switch, remote
control or thermostat wires to the top
& bottom terminals on the gas valve.
8. Reinstall glass frame assembly.
Page 16.
9. Reinstall upper louver, upper hood
and lower grill. Page 42.
10. Turn gas on.
11. Verify proper log placement,
operation of fireplace, and any
electrical components.
WARNING: DO NOT OPERATE THIS FIREPLACE WITHOUT THE SEALING GASKET (LOCATED
UNDER THE MILLIVOLT BOARD) IN PLACE. IF THE GASKETING IS DAMAGED, IT MUST BE
REPLACED.
CAUTION: CHECK ALL
CONNECTIONS FOR
LEAKS, WHETHER FIELD
OR FACTORY MADE.
MILLIVOLT BOARD INSTALLATION
PILOT SHIELD
INSTALLED HERE
EMBER REFRACTORY
PANELS
PAGE 41
CUT AWAY SIDE VIEW.
PILOT ASSEMBLY
SITTING ABOVE
BURNER ASSEMBLY.
PROPER BURNER VENTURI
POSITION OVER MILLIVOLT
BOARD ORIFICE. Venturi opening
setting shown in LP configuration.
RE-CONNECT ANY REMOTE /
THERMOSTAT WIRES