Installation manual

7
Top stand-off brackets and stand-off heat shield are attached to fireplace top in a flat state for shipping.
1. Remove and save (4) screws securing stand-off heat shield and stand-off brackets.
2. Form each stand-off bracket as shown.
3. Re-attach stand-off brackets to fireplace using screws previously removed along with (4) screws provided in fireplace components
packet.
4. Form stand-off heat shield and attach to stand-off brackets with (2) screws provided in fireplace components packet.
(Flange on stand-off heat shield faces ‘up’ and to front of fireplace).
STAND-OFF / STAND-OFF HEAT SHIELD ASSEMBLY & INSTALLATION
WARNING
Top stand-off brackets must be formed and attached prior to positioning fireplace into framed opening.
Stand-offs provide 5-1/2” (140mm) minimum clearance to header. Use only non-combustible material in this area for entire
width of fireplace. Do not use wood, sheetrock, etc. in this zone. Other clearances apply. All clearances must be maintained.
Stand-off brackets are not load bearing.
STAND-OFF BRACKETS AS SHIPPED
REMOVE SCREWS SECURING STAND-OFF BRACKETS
ALIGN HOLES IN FORMED STAND-OFFS WITH HOLES IN
FIREPLACE TOP. SECURE WITH (4) SCREWS.
FORM STAND-OFF BY BENDING AT PERFORATIONS
FORMED STAND-OFF
STAND-OFF BRACKETS
INSTALLED
ALIGN HOLES IN FORMED STAND-OFF HEAT SHIELD WITH
HOLES IN STAND-OFF BRACKETS. SECURE WITH (4) SCREWS.
STAND-OFF HEAT
SHIELDS INSTALLED
Figure 7a
FIREPLACE PREPARATION