User's Manual
Table Of Contents
- SkyZhone 45 installation Guide
- Federal Communications Commission (FCC) Part 15 Regulation
- Contents
- About This Guide
- Overview
- Preparing for Installation
- Installation
- Provisioning
- System Maintenance
SkyZhone 45 Installation Guide 39
4
DR
A
FT
PROVISIONING
This chapter explains how to provision the SkyZhone 45. It has the following
sections:
• Overview, page 39
• The management interface, page 41
• Provisioning overview, page 43
• Verifying the installation, page 49
• The QuickStatus command, page 50
After the system is provisioned, it will be fully functional and able to transmit
data.
Overview
The SkyZhone 45 system is provisioned through the DB-9 (Craft) serial port
on the IDU using a VT-100 terminal or a PC running terminal emulation
software.
Note: The system will not transmit or receive until you complete the
provisioning as explained in this chapter.
This section gives a provisioning overview and includes these sections:
• Provisioning the primary operational frequency, page 39
• Provisioning the secondary frequency, page 40
• Provisioning transmitter power, page 40
• Provisioning the receive attenuator setting, page 40
• Provisioning the transmit overlimit regulator, page 40
• Enabling the RF power amplifier and LNA, page 40
Provisioning the primary operational frequency
The primary operational frequency is the frequency that the system will
operate on when it is initiated. Before choosing this frequency, perform an
interference analysis using a spectrum analyzer. The channel should be clear