User's Manual

Connect to network
zNID 24xxA1 Hardware Installation Guide
47
Figure 12: zNID-GE-24xxA1 model uses SC/UPC connector (blue)
2 Remove the dust covers from the SC optical connectors.
Clean the connector if necessary.
3 Plug in the fiber connector to connect the zNID to the network.
Note: To function properly the optical strength to the zNID
should be between -8dBm and -27dBm for GPON and between
-2dBm and -23dBm for GE units. See Testing optical power on
page 44 for information.
4 Reattach the fiber service cover onto the zNID including the fiber service screw.