Installation guide
HOME/SHOP HEATER
CONFIGURATIONS
5
6”
1”
10”
6”
1”
10”
18”
10”
CLEARANCES: ‘ALCOVE INSTALLATION’
Minimum clearances to combustibles:
Due to radiant heat from the side panels, home/shop heaters require more space for placement.
ALCOVE
DIRECT
THROUGH
THE WALL
1”
10”
18”
6”
3”
6”
10”
1”
1” from the back 16” from the top 10” from the sides
CLEARANCES: ‘DIRECT VENT INSTALLATION’
45 CORNER THROUGH WALL
o
45 CORNER INTERIOR CORNER
o
6”
1”
10”
6”
1”
10”
18”
6”
3”
10”
16”
12”
12”
12”
12”
NOTE: If interior vent is used, the clearance
to the back wall is determined by the
upward-turned elbow or TEE. It
will vary in depth depending
on the brand of PL vent used.
Before placing the stove,
connect the elbow or TEE and
measure off the 3” clearance.
Install all venting as per vent
manufacturer’s instructions.
Venting should
terminate no less
than 12” away
from outside walls.
INTERIOR
VERTICAL
DIRECT
THROUGH
WALL