Installation Guide
Table Of Contents
- D4-9 Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety
- Additional Product
- Components
- Specifications
- Installation Checklist
- Installation
- Safety Rules
- Using Tools
- Clearances
- Usable Area
- Selecting a Location
- Planning for Electrical Work
- Unloading and Unpacking
- Selecting your Power Post Location
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- Raising the Crosstubes
- Installing the Runways
- About Safety Locks
- Installing the Safety Lock Release Mechanism
- About the Pivot Pieces
- Installing the Top Caps
- Routing the Lifting Cables
- Installing the Safety Covers
- Installing the Power Unit
- Installing the Flex Tube
- Hydraulic Fluid Contamination
- Installing the Hydraulic Hose
- Working with Compression Fittings and Tubing
- Installing the Return Line
- Contacting the Electrician
- Connecting to a Power Source
- Adding Hydraulic Fluid
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Final Checklist Before Operation
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store