Installation Guide
Table Of Contents
- D4-9 Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety
- Additional Product
- Components
- Specifications
- Installation Checklist
- Installation
- Safety Rules
- Using Tools
- Clearances
- Usable Area
- Selecting a Location
- Planning for Electrical Work
- Unloading and Unpacking
- Selecting your Power Post Location
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- Raising the Crosstubes
- Installing the Runways
- About Safety Locks
- Installing the Safety Lock Release Mechanism
- About the Pivot Pieces
- Installing the Top Caps
- Routing the Lifting Cables
- Installing the Safety Covers
- Installing the Power Unit
- Installing the Flex Tube
- Hydraulic Fluid Contamination
- Installing the Hydraulic Hose
- Working with Compression Fittings and Tubing
- Installing the Return Line
- Contacting the Electrician
- Connecting to a Power Source
- Adding Hydraulic Fluid
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Final Checklist Before Operation
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
D4-9 / D4-9X Four-Post Lifts 62 P/N 5900251 — Rev. A— October 2020
Wiring Diagrams
These wiring diagrams use the United States color codes for the three wires in the Pigtail that comes
out of the Electrical Box on the Power Unit:
⚠ WARNING: All electrical work, such as hard-wiring the unit or attaching a Plug to the Power
Cord,
must be done by a licensed, certified Electrician
in accordance
with all applicable local electrical codes. Damage caused by improper electrical
installation may void your warranty.