Installation Guide

D4-9 / D4-9X Four-Post Lifts 34 P/N 5900251Rev. AOctober 2020
4.
Switching to the Attachment Plate and the Power Unit
: Put the Vibration Dampener in
place, and then secure the Power Unit using four M8 x 1.25 x 25 Bolts, M8 Washers, and M8
Nuts.
Tip The Power Unit is heavy. We recommend having one person hold the Power Unit while
another person secures it in place.
5. Find the Safety Placard and Zip Tie from the Parts Box, then use the Zip Tie to attach the Safety
Placard to one of the unused holes on the Power Unit Plate.
6. Slide the Flex Tube Bracket over the two Bolts that are closest to the side of the Powerside
Runway.
Not necessarily to scale. Not all components shown.
7. Securely tighten the Bolts and Nuts.
Do not connect the Power Unit to a power source at this point.