Installation Guide
Table Of Contents
- D4-9 Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety
- Additional Product
- Components
- Specifications
- Installation Checklist
- Installation
- Safety Rules
- Using Tools
- Clearances
- Usable Area
- Selecting a Location
- Planning for Electrical Work
- Unloading and Unpacking
- Selecting your Power Post Location
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- Raising the Crosstubes
- Installing the Runways
- About Safety Locks
- Installing the Safety Lock Release Mechanism
- About the Pivot Pieces
- Installing the Top Caps
- Routing the Lifting Cables
- Installing the Safety Covers
- Installing the Power Unit
- Installing the Flex Tube
- Hydraulic Fluid Contamination
- Installing the Hydraulic Hose
- Working with Compression Fittings and Tubing
- Installing the Return Line
- Contacting the Electrician
- Connecting to a Power Source
- Adding Hydraulic Fluid
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Final Checklist Before Operation
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
D4-9 / D4-9X Four-Post Lifts 23 P/N 5900251 — Rev. A— October 2020
Installing the Runways
Your Lift has two Runways:
• Powerside Runway: Has the Lift’s Hydraulic Cylinder underneath it. Lifting Cable routing starts
under the Powerside Runway.
• Offside Runway: The Offside Runway does not have a Hydraulic Cylinder under it, nor are there
any Lifting Cables or Runway Sheaves under it.
⚠ WARNING Runways are very heavy and very long. Only let trained personnel move the
Runways and only use appropriate tools, such as a Forklift or Shop Crane.
The following drawing shows the correct orientations of the Runways.
The only valid locations for the Power Post are Driver-Side Front or Passenger-Side Rear. Not
necessarily to scale. Not all components shown.
To install the Runways:
1. Make sure all six Sheaves have been removed from under the Powerside Runway.
There are two on one end and four on the other end.
2. Locate the eight M12 x 1.75 x 90 Bolts and M12 Washers needed to secure the Runways in place.
3. Using a Forklift or Shop Crane, carefully move the Runways, one at a time, to their required
positions with two Bolts and Washers on each end going into the Crosstubes.