Installation Guide

D4-9 / D4-9X Four-Post Lifts 23 P/N 5900251Rev. AOctober 2020
Installing the Runways
Your Lift has two Runways:
Powerside Runway: Has the Lift’s Hydraulic Cylinder underneath it. Lifting Cable routing starts
under the Powerside Runway.
Offside Runway: The Offside Runway does not have a Hydraulic Cylinder under it, nor are there
any Lifting Cables or Runway Sheaves under it.
WARNING Runways are very heavy and very long. Only let trained personnel move the
Runways and only use appropriate tools, such as a Forklift or Shop Crane.
The following drawing shows the correct orientations of the Runways.
The only valid locations for the Power Post are Driver-Side Front or Passenger-Side Rear. Not
necessarily to scale. Not all components shown.
To install the Runways:
1. Make sure all six Sheaves have been removed from under the Powerside Runway.
There are two on one end and four on the other end.
2. Locate the eight M12 x 1.75 x 90 Bolts and M12 Washers needed to secure the Runways in place.
3. Using a Forklift or Shop Crane, carefully move the Runways, one at a time, to their required
positions with two Bolts and Washers on each end going into the Crosstubes.