Installation Guide
Table Of Contents
- D4-9 Manual
- Table of Contents
- Introduction
- Shipping Information
- Safety
- Additional Product
- Components
- Specifications
- Installation Checklist
- Installation
- Safety Rules
- Using Tools
- Clearances
- Usable Area
- Selecting a Location
- Planning for Electrical Work
- Unloading and Unpacking
- Selecting your Power Post Location
- Creating Chalk Line Guides
- Moving the Posts into Position
- Installing the Crosstubes
- Raising the Crosstubes
- Installing the Runways
- About Safety Locks
- Installing the Safety Lock Release Mechanism
- About the Pivot Pieces
- Installing the Top Caps
- Routing the Lifting Cables
- Installing the Safety Covers
- Installing the Power Unit
- Installing the Flex Tube
- Hydraulic Fluid Contamination
- Installing the Hydraulic Hose
- Working with Compression Fittings and Tubing
- Installing the Return Line
- Contacting the Electrician
- Connecting to a Power Source
- Adding Hydraulic Fluid
- Installing a Power Disconnect Switch
- Installing a Thermal Disconnect Switch
- About Embedment
- Anchoring the Posts
- Final Leveling
- Installing Accessories
- Lubricating the Lift
- Performing an Operational Test
- Final Checklist Before Operation
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Drawings
- Automotive Lift Institute (ALI) Store
D4-9 / D4-9X Four-Post Lifts 11 P/N 5900251 — Rev. A— October 2020
Installation Checklist
Following are the steps needed to install your Lift. Perform them in the order shown.
☐ 1. Review the installation safety rules.
☐ 2. Make sure you have the necessary tools.
☐ 3. Check for clearances around the Lift.
☐ 4. About the usable area of the Lift.
☐ 5. Select the Lift location.
☐ 6. Plan for electrical work.
☐ 7. Unload and unpack the Lift components.
☐ 8. Choose the Power Post location.
☐ 9. Create chalk line guides.
☐ 10. Move the Posts into position.
☐ 11. Install the Crosstubes.
☐ 12. Raise the Crosstubes.
☐ 13. Install the Runways.
☐ 14. About Safety Locks.
☐ 15. Install the Safety Lock Release Mechanism.
☐ 16. Install the Top Caps.
☐ 17. Route the Lifting Cables.
☐ 18. Install the Safety Covers.
☐ 19. Install the Power Unit.
☐ 20. Install the Flex Tube.
☐ 21. About Hydraulic Fluid Contamination.
☐ 22. Install the Hydraulic Hoses.
☐ 23. About Compression Fittings and Tubing.
☐ 24. Contact the Electrician.
☐ 25. Adding Hydraulic Fluid.
☐ 26. Connect to a power source (
Electrician may be required
).
☐ 27. Install the Power Disconnect Switch (
Electrician required
).
☐ 28. Install the Thermal Disconnect Switch (
Electrician required
).
☐ 29. About Embedment.
☐ 30. Anchor the Posts.
☐ 31. Perform final leveling.
☐ 32. Install the accessories.
☐ 33. Lubricate the Lift.
☐ 34. Perform an operational test.
☐ 35. Review the final checklist.