6. Raise the lift off the safety locks by pressing the
push button on the power unit. Make sure you raise the
lift by at least two inches to allow adequate clearance for
the safety lock to clear. ( See Fig. 8.3 - 8.5)
8. Lower lift by depressing lowering valve on power
unit.
9. Run the lift up and down a few times to ensure that
the locks are engaging uniformly and that the safety
release mechanisms are functioning. Re-adjust if
necessary
STEP 9
(Bleeding)
1. Lift must be fully lowered before changing or adding
fluid.
2. Raise and lower lift six times. The cylinder is self
bleeding. After bleeding system, fluid level in power unit
reservoir may be down. Add more fluid if necessary to raise
lift to full height. It is only necessary to add fluid to raise lift
to full height.
3. To pressure test, run lift to full rise and run motor for
approximately 3-seconds after lift stops. This will place
pressure on the hydraulic system. Stop and check all fittings
and hose connections. Tighten or reseal if required.
POST-INSTALLATION CHECK-OFF
tLift Assembly, Level And Stable
tArm Assemblies Properly Attached
tElectric Power Supply Confirmed
tSafety Locks Functioning Properly
tCheck For Hydraulic Leaks
tOil Level
tLubrication of Critical Components
tCheck For Overhead Obstructions
tRunways Level
tAll Screws, Bolts, and Pins Secured
tSurrounding Area Clean
tOperation, Maintenance and Safety Manuals on Site
Fig 8.4
Fig 8.3
Safety Unlocked
Fig 8.5