Full Product Manual
10
STEP 3
(Power Unit Set Up)
1. Set the Power Unit on the Stand/Tow Handle and
mount using the four M8 x 1.25 x 20mm Bolts, Nuts and
Washers. (See Fig 3.1)
2. Remove plug from power unit and install the 90°
Fitting w/ O-ring into the power port on the Power Unit.
Take care to make sure the O-ring seats properly.
3.
Connect the 144" Hydraulic Hose to the 90° Fitting.
4.
Fill the reservoir with 6 quarts/1.5 gals of AW-32 or
Dexron III or VI automatice transmission fluid.
STEP 4
(Connecting Hydraulic Fittings / Hoses)
1. Remove the plastic plug from the left port of the left
hand Cylinder.
2. Install the Straight Hydraulic Fitting in the left port of
the left hand Cylinder. Use Teflon tape on the Cylinder
side on the Fitting only.
3.
Attach the 144" Hydraulic Hose to the Straight
Fitting in the port of the left hand side Cylinder.
4.
Check the 21.25" Hose connections and 90° Fittings
on the right side of the left side Cylinder Fitting.
Then check the other end of the 21.25" Hose and 90°
Fitting on the left fitting side of the right hand Cylinder.
5. The right side hydraulic port of the right Cylinder
should be plugged with a metal plug. Check plug and
tighten if necessary. (See Fig 4.1)
Fig 3.1
Fig 4.1.