Full Product Manual
VISIT US ON THE WEB AT WWW.DANNMAR.COM14
3. With the carriages in equal position from the floor, start by feeding the cable thru the right side hole
(when looking into the post on the open side) in the top of the carriage down thru the bottom of the
carriage around the bottom pulley (right side) , across the floor around the bottom pulley on the oppo-
site Post (left side) , thru the back of the carriage to the top Pulley and connect to the left side hole in
the top of the carriage. Repeat steps on cable # 2. (See figure 8)
4. After the equalizer cables have been routed, adjust each cable so that they are equal tension. (Guitar
String Tight) Helpful Hint: You can remove the top pulley to get slack in the cable facing down and
push it through the bottom of the carriage and get better access to tighten the cable nut, push the
cable pulley back on and make final adjustment.
Fig: 8
CABLE ROUTING DIAGRAM










