
Illustration 6.10: Fasten Front Screws and En-
sure Proper PE Connection
The two front screws are the PE connection to the front cover. Make sure that
both screws are mounted and fastened with the specified torque.
6. Installation and Start-up
L00410582-01_02 49
6