Technical data
Note:
PELV protection is effective up to 2000 m above sea level only.
Other factors like higher irradiation should also be taken into account. The heat-sink should be
cleaned regularly and checked for dust and blocking elements once a year.
Optimise reliability and lifetime by mounting the inverter in a location with low ambient temper-
ature.
Note:
For calculation of ventilation, consider a max. heat dissipation of 600 W per inverter.
5.3.5. Simulation of PV
Contact the supplier before connecting the inverter to a power supply for testing purposes, e.g.
simulation of PV. The inverter has built-in functionalities that may harm the power supply. For
more information, see section
Description of the Inverter, Start-up.
5. Requirements for Connection