Installation Guide
© Danfoss | Climate solutions | 2021.07
AN383426363919en-000101 | 11
Step 02: Remove jumper from selected terminal. In this example, remove jumper from Controller 1 at X100.
Step 03: Wire terminal X63 to terminal X100
Fig. 18
NOTE: The control sequence the EKE 400 controller will apply on receipt of this signal may be easily set up by using the CoolConfig
software interface.
IMPORTANT: Only the DO in the controlled evaporator circuit will be de-energized by this function. AO will not be affected and will
continue to operate according to the output signal of the controller.