Operating instructions
Table Of Contents

2.5 Commissioning
Caution The installation may only be commissioned if the heating system and
brine system have been filled and bled. Otherwise the circulation
pumps can be damaged.
Caution If the installation is only to be driven by the immersion heater during
the installation, ensure that the heating system is filled and the brine
pump and compressor cannot be started.
Commissioning DHP-M
VIJSE302 Danfoss Heating Solutions
10