Installation guide
24 Installation guide RI8BP602 © Danfoss 10/2011 AKM/AK Monitor/AK Mimic
Appendix 3 - continued
d) Repeat points a, b and c, so that the AKM Programme will
also prepare the modem gateway (241:125).
8. Now obtain information from the two gateways, so that it will
be known by the AKM Programme:
a) Select “Upload”
b) Enter network number (241)
c) Select the “Net configuration” field and push “OK”. Continue
with this function, so that the network configuration will be
saved.
9. Set the clock in the master gateway (_:125), so that any alarms
will be correctly time-stamped.
a) Select “AKA”
b) Select master gateway (241:125)
c) Set the clock via “RTC”.
The basic settings are now in order, so that the AKM
Programme is ready to communicate with an external
network.
10. This is how you establish contact to an external system
a) Add a router line in the modem gateway, so that the new
network can be contacted
b) Add or adjust the router setting in the PC gateway, so that
the new network can be connected via the modem gateway
c) Find the “AKA" menu
d) Select the line “Unknown AKA” and push “Router”
e) Now indicate the system address on the external network’s
modem gateway (e.g. 1:125)
- If no connection is established, an alarm messa ge will
appear
- If there is connection to the gateway in qu estion, contact
will be established, and you will now have to set router
lines in the modem gateway on the external network
f) When contact is established and data can be read, this is
proof that the system can communicate. Switch off the con-
trol and move on to one of the other applica tion examples
shown below.
10
?
241 : 120
5c