Operating Instruction

click Load button.
Reboot
Click it to restart the equipment
V. Cautions
1. After operation, the CPE power supply shall be shut down before electrical
switches on the vehicle. On the contrary, the electrical switches shall be
switched on before the CPE power supply.
2. The shovel is equipped with UPS. When shovel is shut down for maintenance,
the CPE power supply shall be shut down before UPS (Switch off two switches on
the UPS). After shovel maintenance, the UPS shall be switched on before CPE.
3. The CPE is an electronic product with high precision. The water guns shall not
be aimed at CPE when washing the vehicle. It is suggested to cover the CPE with
plastic bag before washing the vehicle.
4. The CPE shall not be connected to power supply without purification.
VI. After-sale support
If you have any question regarding this instruction, please do not hesitate to
contact DFMC, we will be at your service at anytime.
In order to improve the product performance, some upgrades might be applied
to the hardware or software. Please refer to the actual product if there is
difference between product and instruction.
DFMCs explanation shall be prevailed when there is divergence on this
instruction.