Instructions / Assembly

Figure A Figure B Figure C
Image I
2. REFER TO TABLE 1 ON PAGE 1 TO DETERMINE IF YOUR REPLACEMENT INVOLVES A LEFT FRONT, RIGHT FRONT, SIDE, OR ANGLED HANDLE PLACEMENT.
1. Remove existing handle
and arm. Loosen locknut
and pull entire arm
out through tank hole.
FOR LEFT SIDE VERTICAL TOILETS:
LEFT SIDE VERTICAL (PLASTIC HANDLE)
*Image shows Straight Lever Handle Style
Handle (A)
Locknut (C)
Red Button (E)
Lever Arm (D)
Lever Mount (B)
3. Remove arm from packaging. Refer to Image I for how to hold the handle. Do not push red button marked X in Image I at this time.
5
Use for Steps 5 through 6
Image III
Use for Steps 4
Image II
Image IV
Use for Step 7
Image V
Use for Step 7
Image VIIIImage VII
Image VI
Use Image IV and Image V for step 7
7. Position lever arm (D) perpendicular (90° Degrees)
to handle and slide back onto lever mount (B) using
arrows to align with notches; then twist to lock
in place.
Use Image III for steps 5 through 6
5. Insert lever mount (B) through tank hole with
the handle facing left while ensuring the T
mark on the hub of the lever mount is facing up.
6. Reattach locknut (C) back onto lever mount (B)
clockwise finger tight, ensuring locknut is
facing flat side toward handle.
Use Image II for step 4
4. Hold the handle in one hand, grab the
threaded hub portion of the Lever Mount (B)
with the other hand and pull apart (1),
compressing the spring at the end. Then
rotate the threaded hub 90 degrees (2)
until T faces up in the orientation it will be
installed in the tank. Release the threaded
hub, ensuring it seats fully back into the
handle.
8. For angle adjustment (Image VI) inside toilet, push down on red button (E) and lift lever arm (D) to adjust angle left or right and align
placement prior to connecting flapper chain.
9. For lever arm (D) height adjustment inside toilet (Image VII), push in toward lever mount (B) and rotate up or down.
10. Attach chain (Images VII and VIII). Chain needs ½" slack with flapper closed. Arm cannot hit tank cover.
Hub of Lever
Mount (B)