Installation manual
Danaher Motion Kollmorgen Unpacking and Inspecting
SERVOSTAR
®
S and SERVOSTAR
®
CD Series 3
UNPACKING AND INSPECTING
Electronic components in this amplifier are design hardened to reduce
static sensitivity. However, proper procedures should be used when
handling.
Remove all packing material and equipment from the shipping container.
Be aware that some connector kits and other equipment pieces may be
quite small and can be accidentally discarded if care is not observed when
unpacking the equipment. Do not dispose of shipping materials until the
packing list has been checked.
Upon receipt of the equipment, inspect components to ensure that no
damage has occurred in shipment. If damage is detected, notify the carrier
immediately. Check all shipping material for connector kits, manuals,
diskettes, and other small pieces of equipment.
Bus Module Model Numbers
Month Manufactured
A - January
B - February
:
:
L - December
9 8 A-5 8 9
P A 0 8 0 0
Unit Manufactured
Year Manufactured
Rated Current (Amps):
08, 14, 28, 50, 75, 85, LM
Hardware Variations
00 - Standard
SERVOSTAR
®
BUS Module