Installation manual

22
NOTE
After powering down the drive, monitor the BUS voltage by connecting a
meter from J1-4 (+BUS) to J1-3 (-BUS) to verify the internal BUS capacitors
have discharged prior to working on the drive.
J1-5, J1-6
C2 CTRL VAC
C1 CTRL VAC
These terminals connect 120/240 VAC power to the drive’s control voltage
power supply.
-#00
$!#$5&
"# =>
!$( "$(
  '*&!$,-
 #:  #
60 9-(7Q
NOTE
For maximum ride through capability a 240 VAC input is recommended.
J1-7, J1-8, J1-9
L3 240 VAC
L2 240/120 VAC
L1 240/120 VAC
These terminals connect 120/240 VAC power to the drive’s output power
stage BUS.
For single phase operation 120/240 use inputs J1-8, L2, and J1-9, L1.
-#00 !#$
 
! ! 0$70$G-
<( 0$
&
  '*&!$-
 #: 
60   
!$ )& 9-(' 9-(' 9-('
!$)& 9-(' 9-(' 9-('
!$)& 9-(' 9-(' 9-('
1
Maximum AC Line is specified to limit the mains surges to the drive.
2.5.2
J1 – DC Input Power Models Drive Power Connector
The S200 DC input drives should be powered from power supplies with
reinforced isolation.
On DC input drives, J1 is a 3 pin plugable connector.