User`s manual
86    Spyder3 GigE Vision SG-14 Monochrome Cameras User’s Manual 
03-032-20123-01    Teledyne DALSA 
Note that all external inputs (from the camera, TTL inputs, and PLC controls) are resynchronized. The 
outputs from the look-up table are synchronous. 
The LUT is programmed using a simple language. This language allows you to create  logical equations 
that specify the conditions that set particular outputs 
Note: There is a delay of two clock cycles between the inputs of the LUT and its outputs. A clock cycle has 
a period of 30 nanoseconds, so the delay is 60 nanoseconds. 
The signals in the PLC Control Block are defined in the tables below. 
Inputs to CamExpert are labeled In (where n is an integer from 0 to 7) and outputs are labeled Qn (where 
n is an integer from 0 to 15). 
PLC Input Signal Routing Block 
The following code sets the first entry in the PLC’s signal routing block: Setting the Signal Routing Block 
is complicated by the fact that each entry in the table has a different set of enumerated inputs. So for 
example, a value of 0 for i0(i.e. GPIO Input 0) means something different for i6 (i.e. Pulse Generator 1 
Output). Below is a table of enumerated values with respect to each entry. 
For more information on the Signal Routing Block, refer to the section below, Signal Routing Block on 
page 89. 










