4. Connect the quick disconnect ribbon cables to their respectively labeled counterpart.
Note: (OIL-OIL) and (TEMP-TEMP).
5. Connect the CAT5 cable to the system. As the assembled cluster is installed into the dash,
take care when routing this cable to the control box.