Specifications
4 Centrifugal Chillers IMM WMC-2
Installation
Receiving and Handling
The unit should be inspected immediately after receipt for possible damage.
All McQuay centrifugal water chillers are shipped FOB factory and all claims for handling and shipping damage
are the responsibility of the consignee.
On units with factory-installed insulation, the insulation is removed from the vessel lifting hole (also used for
transportation tie-downs) locations and are shipped loose. They should be glued in place after the unit is finally
placed. Neoprene vibration pads are also shipped loose. Check that these items have been delivered with the
unit. They are usually placed in a control panel.
If so equipped, leave the shipping skid in place until the unit is in its final position. This will aid in handling the
equipment.
Extreme care must be used when rigging the unit to prevent damage to the control panels and refrigerant piping.
See the certified dimension drawings included in the job submittal for the center of gravity of the unit. If the
drawings are not available, consult the local McQuay sales office for assistance.
The unit can be lifted by fastening the rigging hooks to the four corners of the unit where the rigging eyes are
located (see Figure 1). Spreader bars must be used between the rigging lines to prevent damage to the control
panels, piping and electrical panels.
Figure 1, WMC-D, Major Component Locations
Compressor #2
Control Panel
Operator Interface
Touch Screen, OITS
Rigging Holes
Each Corner
Evaporator
Condenser
Condenser
Relief Valves
Evaporator Relief Valve
Combined Discharge
Check and Shutoff Valve
Circuit #1
Power Panel
Circuit #2
Power Panel
Optional Single-Point
Power Block or
Disconnect Switch
Inlet
Outlet
Outlet
Compressor #1
Suction Shutoff Valve