Specifications
5. OSHPD Certication: The chiller shall be OSHPD
Pre-Approved per OSP–0116-10 and be so labeled.
The chiller shall meet a minimum seismic design
spectral response acceleration of 1.60 SDS. The
chiller must be mounted to a rigid base and may use
neoprene wafe vibration pads.
– OR –
IBC Certication: The chiller shall be certied to the
following codes and standards; 2009 IBC, 2010 CBC,
ICC-ES AC-156, ASCE 7-05. The chiller must be
mounted to a rigid base and may use neoprene wafe
vibration pads.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installing contractor to:
1. Install per manufacturer’s requirements, shop
drawings, and contract documents.
2. Adjust chiller alignment on foundations, or subbases
as called for on drawings.
3. Arrange piping to allow for dismantling to permit head
removal and tube cleaning.
4. Coordinate electrical installation with electrical
contractor.
5. Coordinate controls with control contractor.
6. Provide all material required for a fully operational
and functional chiller.
3.2 START-UP
A. Factory Start-Up Services: Provide for as long a time as
is necessary to ensure proper operation of the unit, but
in no case for less than two full working days. During the
period of start-up, the start-up technician shall instruct
the owner’s representative in proper care and operation
of the unit.
www.DaikinApplied.com 21 CAT 602-4 • MAGNITUDE
®
MODEL WMC CHILLERS
engIneerIng guIde speCIfICaTIons