Service manual

3LSLQJ,QVWDOODWLRQ3RLQW 6L(1
 $SSHQGL[
 3LSLQJ,QVWDOODWLRQ3RLQW
 3LSLQJ,QVWDOODWLRQ3RLQW
Max. 5m
(V3084)
Maximum length from a connection kit.
10m or less from first branch.
(Equivalent Piping Length 13m)
Since there isa possibility that oil may be collected on astop machine side, install piping
between outdoor units to go to level or go up to an outdoor unit, and to make aslope.
Connection
Kit B
Connection
Kit A
Less than 2m
V3037
The projection part between multi connection piping kits
When the piping length between the multi connection kits or between multi connection kit and
outdoor unit is 2m or more, prepare a vertical projection part (200mm or more as shown below) only
on the gas pipe line location less than 2m from multi connection kit.
In the case of 2m or less
200~
300mm
(V3085)
200~300mm
200~300mm
In the case of 2m or more
Vertical
Projection
Less than 2m
2m or more
Vertical
Projection
Vertical
Projection
Less than 2m Less than 2m