Service manual
Outdoor Unit SiBE041102_A
126 Removal Procedure
17
Release the harnesses
of the relay connector
and the reactor from the
groove.
18
Release the lead wires
of the power supply and
the earth from the
groove.
19
Remove the electrical
box cover and
insulation sheet.
Step
Procedure Points
(R14510)
(R14581)
Electrical box cover
(R14511)
Insulation
sheet