Service manual
SiBE05-722ED
111 Trial Operation and Field Settings
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................112
2. Forced Cooling Operation ...................................................................113
3. Trial Operation ....................................................................................114
4. Field Settings ......................................................................................115
4.1 When 2 Units are Installed in 1 Room..................................................115
4.2 Facility Setting Jumper (cooling at low outdoor temperature) ..............116
4.3 Jumper and Switch Settings.................................................................117
5. Silicon Grease on Power Transistor / Diode Bridge............................118