Service manual
Overview of the heating mode functions ESIE03–01
2–42 Part 2 – Functional Description
3
1
2
4
5
Defrost ending
RYP71-125L
The defrost operation ends:
P After 10 min, or
P As soon as one of the following conditions is met after 1 min or more:
- Outdoor heat exchanger temp. ≥ 10°C
- Discharge pipe temp. > 120°C.
Hot start after
defrosting
The hot start function is activated:
P 40 s after the defrosting ending, or
P When Tc > 34°C (indoor heat exchanger temperature).
Used input The defrost control uses the following inputs:
4 Hot start after defrost The unit remains in the hot start standby (indoor unit fan
OFF) mode for:
P 40 s after defrost ending, or
P Until the indoor heat exchanger temperature increases.
Note Control and time Description
Input
Connection on
indoor PCB
Connection on
outdoor PCB
Outdoor thermistor — R1T
Outdoor heat exchanger thermistor — R2T
Discharge pipe thermistor — R3T
Defrosting start temperature changeover switch — DS1-2
Defrosting forced time changeover switch — DS2-1