Service manual
SiENBE07-618_C Outdoor Unit
Removal Procedure 115
1.4 Removal of PCB
Procedure Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
1
Disconnect the
connectors from the
service monitor PCB
[S52] [S102].
Preparation
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Detach the 4 clamps
with pliers.
3
Remove the screws of
the terminal board and
the earth wire.
(R5280)
[S52]
[S102]
Service monitor PCB
Clamps
(R5281)
(R12285)
Terminal board
Earth wire
SIENBE07-618_C_FRONT.pdf 127 9/02/2011 9:25:09