
Disassembly and Maintenance ESIEN05-04
5–48 Part 5 – Disassembly and Maintenance
5 Turn the provisional
hanger to disengage it
from the hook of switch
box, and slide the
decoration panel in the
arrow direction to remove
the panel.
Step Procedure Points
(S2640)
(S2641)