Specifications
Indoor Unit SiBE04-624
238 Removal Procedure
1.7 Removal of the PCB
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step Procedure Points
1. Remove the shelter Preparation
Remove the electrical box
according to "Removal of
the Electrical Box".
1
External appearance of
the electrical box.
2
Undo the hook of the
shelter.
3
While opening the
shelter, undo the lower
hook and lift the shelter
up to undo the upper
hook on the back.
4
Slide the shelter
upward while lifting up
(without hooked) and
undo the 2 sockets.










