Specifications

AISIN AUTOMATIC TRANSAXLE 5A2 – 175
DAEWOO V–121 BL4
Assembly Procedure
1. Install the 2 seal rings to the input shaft.
Notice : Do not expand the ring ends excessively.
2. Coat a new O–ring with ATF and install the O–ring
to the input shaft.
3. Coat a new O–ring with ATF and install the O–ring
to the direct clutch piston.
4. Coat the direct clutch piston with ATF, install it to
the direct clutch drum.
Notice : Be careful not to damage the lip seal of direct
clutch piston.