Specifications
AISIN AUTOMATIC TRANSAXLE 5A2 – 101
DAEWOO V–121 BL4
Installation Procedure
1. Install the shift control lever assembly and mount-
ing bolts and nuts.
Tighten
Tighten the shift control lever assembly mounting
bolts and nuts to 8 NSm (71 Ib–in).
2. Connect the control cable to the shift control lever
assembly.
3. Tighten the control cable adjusting nut.
Tighten
Tighten the control cable adjusting nut to 8 NSm (71
Ib–in).
4. Connect the harness connector.
5. Adjust the control cable. Refer to ”Control Cable
Adjustment” in this section.
6. Install the floor console. Refer to Section 9G, Interi-
or Trim.
7. Connect the negative battery cable.
TRANSMISSION RANGE (TR)
SWITCH
Removal Procedure
1. Disconnect the negative battery cable.
2. Disconnect the Transmission Range (TR) switch
electrical connector from the wiring harness.










