Planning Guide
Table Of Contents
⑤ Procure the proper 
installation materials 
 Preparation for install 
Manual  Screw (6) 
(M4 L10 2 each, M4 L16 2ea, 
24 3/16 UNC L145 nut toggle 2 each) 
Regulator (1) * 
Anti Tip Brackets (2) * 
Gas line shut-off 
valve 
Flexible metal 
Appliance connector 
½ in (ID) x 5 ft. 
Flare union adapter ¾ 
in (NPT) x ½ in (ID) 
Flare union adapter ½ 
In (NPT) x ½ in (ID) 
135-degree elbow 
(optional) 
Flat-blade 
screwdriver 
Phillips screwdriver 
Open-end or 
adjustable wrench 
Pipe wrench (2) 
¼” Nut driver  Pencil and ruler  Level  Pipe joint compound 
Soapy water solution Utility knife 
Lag bolt or ½-in (OD) 
sleeve anchor 










