Installation Instructions
English  47 
Installation instructions
Installing a 3-wire conduit
•  Aluminum building wire may be used but it must be rated for the correct amperage 
and voltage. Connect wires according to Step 4 depending on the number of wires.
•  Wire used, location and enclosure of splices, etc., must conform to good wiring 
practices and local codes.
White
Black
Red
Ground 
strap
Neutral 
terminal
Wire tips
Red
White
Black
1.  Loosen the 3 lower terminal screws 
from the terminal block.
2.  Insert the center bare wire (white/
neutral) tip through the bottom center 
terminal block opening. On certain 
models, the wire will need to be 
inserted through the ground strap 
opening and then into the bottom 
center block opening.
3.  Insert the two side bare wire tips into 
the lower left and the lower right 
terminal block openings.
4.  Tighten the screws until the wire is 
firmly secured (35 to 50 inch-lbs.). Do 
not over-tighten the screws since it 
could damage the wires.
Install_NY9900M_PRORANGE_DOP48M96DLM_DA_DG68-00936A-00_EN+MES+CFR.indb 47 2017-05-12  7:36:51










