Installation Instructions
English44 
Installation instructions
Installation instructions
Installing the power cord
Strain relief
Power cord
Conduit connection 
plate
For power cord installations, hook the 
strain relief over the power cord hole (1⅜") 
located below the rear of the drawer body. 
Insert the power cord through the strain 
relief and tighten the device.
•  You must install the power cord with a 
strain relief.
•  Attach the strain relief to the 1⅜" 
opening in conduit connection plate.
Installing a 3-wire power cord
WARNING
The neutral or ground wire of the power cord must be connected to the neutral terminal 
located in the center of the terminal block. The power leads must be connected to the 
lower left and the lower right terminals of the terminal block.
Ground strap
Neutral 
terminal
Black
White
Red
Black
White
Red
1.  Remove the 3 lower terminal screws 
from the terminal block.
2.  Insert the 3 terminal screws through 
each power cord terminal ring and into 
the lower terminals of the terminal 
block. Be certain that the center wire 
(white/neutral) is connected to the 
center lower position of the terminal 
block.
3.  Tighten screws securely into the 
terminal block. DO NOT remove the 
ground strap connection.
Install_NY9900M_PRORANGE_DOP48M96DLM_DA_DG68-00936A-00_EN+MES+CFR.indb 44 2017-05-12  7:36:50










