Installation guide
xStack
®
DGS-3200 Series Layer 2 Gigabit Ethernet Managed Switch
24
Wall Installation Steps
Before beginning installation, simulate hanging the Switch by holding it against the wall with the wall mounting ears and marking
the positions of the oval holes. These holes will be used with the wall mounting ears for installing the concrete sleeve anchors.
Figure 2- 12. Illustration of each installation step
1. Use a power drill with an 11mm diameter bit to drill four holes at the marked points, each of a depth of 37 to 40
mm.
2. For each hole, put the smaller end of one concrete sleeve anchor into the hole.
3. Use a hammer to firmly smack each concrete sleeve anchor into one of the four holes. Each sleeve anchor
should be nearly flush with the wall the Switch is being mounted to.
4. Complete the installation by firmly tightening each screw.
If the Switch is being mounted on a cement wall, D-Link recommends using a concrete sleeve anchor, such as the one depicted
below that is part of the optional D-Link Wall Mount kit, DRE-KIT018. The D-Link Wall Mount kit consists of 8 screws, 4
concrete sleeve anchors, and 2 wall ears.
Figure 2- 13. Concrete sleeve anchor
Power On
1. Plug o ne end of t he AC power co rd into the power connector of t he Switch a nd the ot her e nd i nto the local
power source outlet.
2. After poweri ng on th e Switch, t he LED i ndicators will m omentarily b link green. This b linking of the LED
indicators represents a reset of the system.
Power Failure
As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch back in.