Installation guide
xStack
®
DGS-3200 Series Layer 2 Gigabit Ethernet Managed Switch
19
Section 2
Installation
Package Contents
Installation Guidelines
Installing the Switch without a Rack
Rack Installation
Power On
Installing SFP Ports
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following items:
DGS-3200-10, DGS-3200-16, or DGS-3200-24 Switch
Quick Installation Guide
AC power cord
Power supply cable clip
Mounting kit (two brackets and screws)
Four rubber feet with adhesive backing
RS-232 console cable for DGS-3200-10/DGS-3200-16 or combo RS-232/RJ-45 console cable for DGS-3200-24
CD Kit for User’s Guide/CLI/D-View module
If any item is missing or damaged, please contact your local D-Link Reseller for replacement.
Installation Guidelines
Please follow these guidelines for setting up the Switch:
Install the Switch on a sturdy , level surface that can support at least 6.6 l b. (3 kg) of weight. Do not place heavy objects
on the Switch.
The power outlet should be within 1.82 meters (6 feet) of the Switch.
Visually inspect the power cord and see that it is fully secured to the AC power port.
Make sure that there is proper heat dissipation from and adequate ventilation around the Sw itch. Leave at least 10 cm (4
inches) of space at the front and rear of the Switch for ventilation.
Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges.
Install the Switch in a si te free from strong electromagnetic field generators (such as motors), vibration, dust, and direct
exposure to sunlight.
When installing the Switch on a level surface, attach t he rubber feet to the bottom of the device. The rubber feet cushion
the Switch, protect the casing from scratches and prevent it from scratching other surfaces.