User manual

QDR InfiniBand Switch Platform User Manual Rev 1.2
Mellanox Technologies
21
5Installation
5.1 Package Contents
The package includes:
1 switch
1 installation kit
1 box containing 1 power cord Type B 6ft US 125V 10A chord
1 installation guide
•1 parts list
Before you install your new switch, unpack the system and check to make sure that all the parts
have been sent, check this against the parts list. Check the parts for visible damage that may have
occurred during shipping.
5.2 Installing the Switch in the Rack
Tools and Parts
Tools required and customer supplied parts
If anything is damaged or missing, contact your customer representative immediately.
The rack mounting holes conform to the IEA-310 standard for 19-inch racks. Guarantee
proper ventilation, by leaving 8cm (3”) of space to the front and rear of the switch. This
will ensure proper air flow through the chassis. This is crucial for maintaining good air-
flow at ambient temperature. In particular, route cables such that they do not impede the
air into or out of the chassis.
This installation kit can only be used to install this switch.
Phillips Screwdrivers #1 and #2 Grounding screw
ESD Strap Grounding wire sufficient to reach a valid ground
•ESD mat