Owner`s manual
Installation (for qualified installers only) 25
© Travis Industries 4101110 100-01256_000
Steps for Finalizing the Installation
1. Remove the glass (see page 27).
NOTE: If using propane (LP) convert the appliance prior to installing the logs, driftwood, or stone
set.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light works correctly.
NOTE
: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4. Install the four AA batteries (included in the owner’s pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner’s pack) into control panel light assembly (see the illustration below). Velcro is provided to secure the
9v battery.
AA Battery
AA Battery
Swing the control
cover down to
access the batteries.
AA
Battery
Holder
AA Battery Tray
AA Battery
AA Battery
Battery Holder for
Control Panel Lights
9v
Battery
5. Install the media (logs, driftwood, or stone set - see page 29).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.










