Specifications
CAK6150/CAK6161 SERIES CONTENTS
SHENYANG MACHINE TOOL CO., LTD I
CONTENTS
1 GENERAL DESCRIPTION ........................................................................................... 1
1.1 Application Scope and Purpose of the Instruction Book ······························ 1
1.2 Identification Marking of Model ························································· 1
1.3 Major Application of the Machine ······················································· 2
1.4 Accuracy of the Machine ·································································· 2
1.5 Working Environment of the Machine ··················································· 2
1.6 Effect of the Machine to the Environment ·············································· 2
2 MATTERS NEEDING ATTENTION TO SAFE GUARD............................................. 3
2.1 Requirements for Operator and Maintainer ············································· 3
2.2 Basic Requirements of Operation ························································ 3
2.3 Requirement Prior to Switching on the Power Supply ································ 4
2.4 Requirement after Switching on the Power Supply ···································· 5
2.5 Normal Inspection ·········································································· 5
2.6 Temperature Raising ······································································· 5
2.7 Preparation before Starting the Machine ················································ 6
2.8 Matters Needing Attention during Operation ··········································· 6
2.9 Machining Interruption ···································································· 7
2.10 After Turning ··············································································· 7
2.11 Safeguard Devices ········································································· 8
2.12 Preparation before Maintenance ························································· 8
2.13 Maintenance Operation ··································································· 8
2.14 Handling after Maintenance ······························································ 9
2.15 Miscellaneous ·············································································· 9
3 HANDLING AND INSTALLATION ........................................................................... 11
3.1 Transportation and Storage of the Machine ············································ 11
3.2 Preparation before Installation ··························································· 11
3.2.1 Ambient Requirement (for Machine) ··········································· 11
3.2.2 Ambient Requirement (for NC) ·················································· 11
3.2.3 Power Interface····································································· 11
3.2.4 General Power Supply ···························································· 11
3.3 Handling ···················································································· 11
3.4 How to Install the Machine ······························································· 14
3.4.1 Foundation ·········································································· 15
3.4.2 Temporary Leveling ······························································· 15
3.5 Inspection of Inner Devices Connection ················································ 15
3.6 Inspection before Operation ······························································ 15
3.7 Final Adjustment of Bed Level ·························································· 16
3.8 Maintenance and Inspection of Inner Devices Connection after Installation ······ 16