Specifications
CAK50/CAK61 SERIES ERROR! USE THE HOME TAB TO APPLY 标题 1 TO THE TEX
SHENYANG MACHINE TOOL CO., LTD 16
anti-rust coating during transportation, so, before starting the machine, clean out
this rust preventive with cloth dipped with cleaning oil. After cleaning, cover them
with a film of lubrication oil.
Inspection of machine:
Check if any part of the machine has been damaged.
Check if any part or attachment has been lost.
Check if every part has been lubricated well.
Check if all the hydraulic pipes have been connected well.
Check electrical system before / after switching on power supply (Refer to
Instruction Book for Electrical Unit).
Matters needing attention when the machine is under the condition of stopped for a
long term:
When the machines is started first time after installation or after a long-term stop,
start it with lubrication to make the slide surfaces have enough lubrication oil.
3.7 Final Adjustment of Bed Level
When the cement in the foundation holes is solidified, adjust the level by leveling bolt
and arrange the leveler according to the rule of “temporary level adjustment”. For the
steps and tolerances of leveling, refer to the “Test Certificate”.
Note:After leveling, leveling nuts and foundation bolts should be tightened firmly to
ensure the level accuracy unchanged. The minimum scale of the leveler being
used is 0.02 mm.
3.8 Maintenance and Inspection of Inner Devices Connection after Installation
3.8.1 Maintenance of Primary Period after Installation
For the primary period after the installation of machine, the level of the machine bed will
change obviously for reasons of unstable solidifying of the surface and the solidification
of foundation are not steady, so that the accuracy of the machine will be greatly affected.
On the other hand, because of the primary wear, the machine is very easy to be polluted,
which will result in machine trouble easily.
Measures that should be taken for maintenance during the primary period of installation
are as follows:
Trial-run
For first time trial-running, it should be carried out with great care, the time of
trial-run is about 1 hours, and heavy load cannot be used during trial-run.
Check the bed level of the primary period
Check the bed level after the machine is installed for six months; check the situation